AL BADIA PLANT

AL BADIA PLANT

KILN’S OUTLET ON THE CLINKER COOLER AND MAINTAINENCE
 SCAFFOLDING, THE OTHER PHOTO SHOWS HYDRAULIC ARC

 PLATFORM FOR REFRACTORY INSTALLATIONS											
  

THE KILN AFTER FINISHING THE REFRACTORY INSTALLATIONS
REFRACTORY INSTALLATIONS BY USING THE HYDRAULIC ARC
  

THE CEMENT SILO
THE KILN AFTER FINISHING THE REFRACTORY INSTALLATIONS
  

SILO CLEANING WORKS
  

A PATTERN OF CEMENT ACCUMULATION IN THE SILO 
INTERING THE SILO
  

MODELS OF THE CEMENT ACCUMULATIONS IN THE SILOS
  

A MODEL OF THE CEMENT ACCUMULATIONS IN THE SILO’S 
INNER CONE


CEMENT DEPORTING MACHINE OUT OF THE SILO
SILO AIR COMPRESSORS 
  

REFRACTORY WORKS IN THE KILN
CASTING CASTABLE IN THE CLINKER COOLER’S WALLS
  

KILN REFRACTORY
  

KILN’S REFRACTORY
KILN’S BURNER RESTORATION
  

THE INNER PIPE IN THE PRE-HEATER
KILN’S BURNER AFTER RESTORATION
  

KILN’S REFRACTORY
THE KILN’S INLET MECHANICAL WORKS 
  

CASTING CASTABLE FOR THE KILN’S INLET
AIR COMPRESSORS IN THE CEMENT SILO
  

PRE-HEATER’S WALLS TREATMENT BY CASTABLE AND 
REFRACTORY.
 SCAFFOLDING, DISMANTLING AND DEPORTING 
THE INNER PIPE IN THE PRE-EATER AND 
REINSTALL THE NEW PIPE.
  

PATTERN OF THE INNER PIPE PLATES EROSION
  

PIPES DURING THE INSTALLATION IN THE PRE-HEATER
MANUFACTURED PIPES
  

FORMED RIVER IN THE KILN
KILN BEFORE DEMOLITION AND REBUILDING
  

MOLD AND CASTING THE CASTABLE IN THE 
CLINKER COOLER AND AN IMAGE SHOWS REFRACTORY 
EROSION OF A PORTION OF THE RIVER
  

CLINKER COOLER MOLDING
 

REFRACTORY WORKS AT THE KILN
CLINKER COOLER MOLDING
    

REFRACTORY WORKS OF THE WALLS IN THE INNER PIPE OF 
THE PRE-HEATER
REFRACTORY WORKS AT THE KILN
  


REFRACTORY WORKS AT THE KILN
SCAFFOLDING PREPARATION FOR CASTABLE CASTING OF THE
 UPPER PART OF THE KILN’S OUTLET
  

PREPARATION WORKS FOR CASTING THE CASTABLE IN THE 
KILN’S INLET AND HOW REFRACTORY WORKS IN THE KILN
  

OUTPUT OF THE COMBUSTION OF REFRACTORIES
EXTERNAL DEFORMATION OF THE MILL’S BURNER
  


STEEL COIL AND REFRACTORY DEFORMATION INSIDE THE BURNER
TEMPLATES FOR CASTING THE CASTABLE
  

COMPRESSORS BEFORE BEING TRANSFERRED FROM THE SILO
  

CLEANING AROUND THE COMPRESSORS BEFORE TRANSFER
TRANSFER THE COMPRESSORS TO THE EXTERNAL ROOM AND 
INSTALL THE AIR PIPES
  