steps of the projects were as follow:
Cutting and replacement of the damaged portions of the Kiln along with the rings: THE CUTTING PROCESS OF THE KILN AND THEN THE REPLACEMENT OF THE RING![]()
Transportation of the cut portion Cutting Process
![]()
Refractory works of the clinker cooler and the CHROME ANCHORS Connect the new portion to the Kiln’s Body
![]()
REPLACEMENT OF THE MIDDLE RING ALONG WITH ITS ACCESSORY, AND A PORTIONS REPLACEMENT OF THE KILN OF 18 MT. LONG AND 4 MT. DIAMETER
![]()
CUTTING PROCESS
![]()
PROBE SAMPLE OF THE OLD CONCRETE FROM THE HOLDING BASE OF THE RING, AND MANUFACTURING PORTIONS OF THE KILN’S CYLINDER OF 4 MT. DIAMETER
![]()
LIFTING AND PREPARING FOR CUT DISMANTLE, FLIP AND INSTALL THE SERRATED WHEEL OF THE KILN
![]()
MANUFACTURING AND TRANSPORTING OF THE KILN’S CYLINDER TO ADRA PLANT. AND KILN’S PORTION DURING INSTALLATION.
![]()
KILN’S BASE
![]()
OIL LEAKAGE REACHING THE KILN’S BASE KILN’S BASE BEFORE CASTING
Transportation of the cut portion
Cutting Process
Refractory works of the clinker cooler and the CHROME ANCHORS
Connect the new portion to the Kiln’s Body
REPLACEMENT OF THE MIDDLE RING ALONG WITH
ITS ACCESSORY, AND A PORTIONS REPLACEMENT OF
THE KILN OF 18 MT. LONG AND 4 MT. DIAMETER
CUTTING PROCESS
PROBE SAMPLE OF THE OLD CONCRETE FROM THE
HOLDING BASE OF THE RING, AND MANUFACTURING
PORTIONS OF THE KILN’S CYLINDER OF 4 MT. DIAMETER
LIFTING AND PREPARING FOR CUT
DISMANTLE, FLIP AND INSTALL THE SERRATED WHEEL OF THE KILN
MANUFACTURING AND TRANSPORTING OF THE KILN’S
CYLINDER TO ADRA PLANT.
AND KILN’S PORTION DURING INSTALLATION.
KILN’S BASE
OIL LEAKAGE REACHING THE KILN’S BASE
KILN’S BASE BEFORE CASTING