HESIAA ROAD NODE

HESIAA ROAD NODE

IRRIGATION TANK FOR GREEN SPACES

 
LAYOUT IMAGE
  

BRIDGE FOUNDATION PREPARATION FOR CASTING
THE BRIDGE FOUNDATION
  

REINFORCING THE BEAM 
18 METER LONG BEAM
  

THE BRIDGE’S MIDDLE FOUNDATIONS
PREPARATION OF THE BEAM’S REBARS
  

THE BRIDGE’S MIDDLE COLUMNS
MOLD AND REINFORCE THE BRIDGE FOUNDATION
  

PREPARING THE SIDE OF THE ROAD DIAGONALLY
LIFTING THE BRIDGE IN ORDER TO INSTALL IT
  

BEDDING THE ROAD BY INTERLOCK TILES
PAVING THE SIDE OF THE ROAD BY WANTON STONE